Siemens PCS7 (TIA) PowerControl Station Gateway connects PLCs with IEC 61850 IEDs

In a post earlier today I wrote: "It does not make sense to decouple power systems from big(ger) applications." ... this reminded me to discuss another use case ... factory automation to substation ...

Siemens offers PLCs with the PCS7 family. They have developed gateways that bring the substation closer to the power user ... 

PCS 7 PowerControl Station Gateway connection of a SIPROTEC 5 protection device (speaking IEC 61850!)

The brochure states at the beginning: "In addition to the demanding process automation requirements in many industrial plants, it is also necessary to integrate the medium-voltage power supply switchgear into a complete automation system.

Components of such plants are electrical consumers with high energy requirements (factories, chemocal plants, ...). Individual consumers are monitored and controlled via protection devices, also known as IEDs (intelligent electronic devices)."

So, my statement on the post earlier today has been confirmed! 

The same is available for the integration of a substation into a Siemens TIA (Totally Integrated Automation) ... TIA Station Gateway: excerpt of that page:

"With the new IEC 61850 server functionality, you can extend your station gateway integration allowing you to reliably publish process data directly to IEC 61850 clients via GOOSE Publisher or MMS polling and reporting with a high degree of performance. Whether protection systems, instrumentation and control or automation environments: The publisher ensures that events are quickly transferred and facilitates fixed data models and the highest degree of interoperability."

WOW.

Monday, August 10, 2026

IEC 61850 covers applications inside substations AND beyond substations

IEC 61850 is applicable for general automation applications as well as for electric power delivery systems. The following lists give an impression of what kind of domains are taken into account so far ... more to come:

Information models and exchange for

  • real-time and near real-time applications  (pub/sub: GOOSE, Sampled Values)
  • protection
  • monitoring, supervision, and control (client/server TCP/IP and WebSocket)
  • substation and feeder equipment
  • substation-to-substation
  • substation-to-control centre
  • power plant-to-control centre
  • distributed generation
  • distributed energy resources
  • micro grids
  • metering
  • power quality
  • condition monitoring
  • hydro, steam, gas power plants
  • wind generation plants
  • data centers

System Configuration and engineering

  • System Configuration Language (SCL)
  • Basic Application Profiles
  • top-down-engineering (model-based engineering)
  • - …

These lists demonstrate that the standard series IEC 61850 covers applications inside substations AND beyond substations. One crucial question remains: What are the logical nodes and data objects ... from which parts of the standard series IEC 61850 are required for a specific application domain?
The answer is here: ask me.

HERE you can find a sample model for an IEC 61850 Profile for Distributed Energy Resources Supporting IEEE 1547 [pdf] ... quite interesting ...

You may search the web for MICS (IEC 61850 model implementation conformance Statement) ... 

Note that substations are very crucial components of the interconnected electric energy systems.

Let me know if you need some help.

Tuesday, August 4, 2026

How are IEC 61850 Information Models related to Functions?

The common understanding of information is crucial for the understanding of the related functions that produce, consume, and exchange the information. Information is always "bound" to functions ... no function - no information.

Let's have a look at this function: 

Supervision of a temperature value ... report an alarm to a well known entity when the temperature change rate reaches a value of xyz ... this is the FUNCTION. Now we model it with IEC 61850:

The temperature supervision is modeled in the logical node MySTMP1. We use the data objects Tmp (reported every x minutes), RteAlm (reported when the value of the RteAlmSet is reached, e.g., 0.5 K/s).

This "function" is described in an SCL document ... here the MySTMP1 is bound to a topology (SSD), e.g., room temperature in building so-and-so, the reports are sent to the SCADA system mySCADA-client, ... the factory acceptance test can more or less be automated based on the SCL document.

The IEC 61850 STMP logical node model follows the temperature supervision function!! 

The function was there well before IEC 61850 was born!

IEC 61850 standardizes the information shared with a real function.

The following diagram shows the basic modelling approach in IEC 61850:

  • IEC 61850-7-2 defines the foundation
  • IEC 61850-7-3 defines the common data classes: MV for measurements, SPS for single point status, and ASG for analogue sessings.
  • IEC 61850-7-4 defines the logical node and data object classes.

More details will follow ... stay tuned.


The real challenge with IEC 61850 is: You likely get the feeling when you start reading hundreds of pages: 
unable to see the wood for the trees.

Let me know if you need help ... after 30 years I can support you.

Monday, July 13, 2026

IEC 61850 for Battery Energy Storage Systems (BESS)

With the growth of planning and installation of BESS the question is discussed, how IEC 61850 could contribute. A lot!

Have a look at three posters that depict the architecture of an electric system that includes batteries ... with some comments from me:

Poster 1
Poster 2
Poster 3

See also a paper on the use of IEC 61850-7-420 (DER) from the year 2014.

Communication networks and systems for power utility automation –
Part 7-420: Basic communication structure –
Distributed energy resources and distribution automation logical nodes

Preview of IEC 61850-7-420 (2021).

A few excerpts:


The DER storage Logical Nodes in IEC 61850-7-420 have hundreds of Data Objects ... see just a few:



IEC TC 57 offers a name space document listing the syntax of all logical nodes and data objects:

That (light) name space is an xml document with 5520 lines !!! The light name space contains the syntax of the models ... the textual semantic is missing ... comes with the purchase of the standard IEC 61850-7-420.

I am confident that IEC 61850 offers the most crucial information models for BESS.

Monday, March 23, 2026

Final Vote on IEC 61850-7-410 (Hydroelectric Power Plants ) is Positive

The edition 3 of the standard IEC 61850-7-410 has been accepted to be published in April 2026:

Communication networks and systems for power utility automation –
Part 7-410: Basic communication structure –
Hydroelectric power plants – Communication for monitoring and control

The document is very detailed and comprehensive: almost 700 pages!

IEC has published a short news on the new document.

Congratulation to the WG 18 of IEC TC 57!

The document is an integral part of the IEC 61850 standards series. Unlike the standard for Wind Power Plants (IEC 61400-25): which is partly an independent standard series. The latest draft for the information model for wind turbine applications (Edition 3) is harmonized with IEC 61850!

Saturday, August 30, 2025

IEC 61850 in Cyber Secure Environments - New Comprehensive Seminar

Due to my family situation (nursing my beloved wife from 2017 to 2022) I had to slow down my training activities. This year I was asked by several senior experts if it would be possible to resume the training.

As a result of discussions with friends of mine, we updated our previous course program and offer a brand new 5-day comprehensive public seminar for Automation, Protection, Monitoring, Engineering, Configuration (SCL), SCADA, Smart Grids, RTU, Gateways, … cyber physical security in electrical systems of any industrial plant … it is available for you and your people.

The reason for the update: We want to do more than teaching the theory of IEC 6850 and demonstrate single IEDs … we want to let our practice talk for your practice. The new training will start in March 2026. Taking the experience with many crucial applications of IEC 61850 into account we offer a new program for a 5-day course conducted by four (4) real experts.

09.-13. March 2026, Karlsruhe (Germany)
21.-25. September 2026, Karlsruhe (Germany)

Click HERE for more details on dates, location, and registration information.

Monday, February 10, 2025

IEC 61850-7-410 ED3 CDC - Hydroelectric Power Plants Available for Public Commenting

Please note that last Friday IEC TC 57 has published the following Committee Draft for Vote (CDV) (57/2750/CDV) for comments by National Committees AND for public commenting by anybody before April 04, 2025:

IEC 61850-7-410 ED3: Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control 

To comment on the CDV please click HERE. If you have not yet an account you can register ... if you have an account, go on. (IEC reports: Please use Google Chrome or Microsoft Edge).

IEC Public Commenting is a chance to let your voice be heard before the final vote.

This draft is a major step forward to get an international standard for hydroelectric power plants, steam and gas turbines.

Friday, October 7, 2016

Huge KIT Energy Lab 2.0 - Relies on IEC 61850

The KIT (Karlsruher Institut für Technologie) in my hometown Karlsruhe/Germany is deeply involved in several projects related to the Energiewende. One of the crucial components is the "Energy Lab 2.0".

In "A Concept for the Control, Monitoring and Visualization Center in Energy Lab 2.0" the authors Clemens Düpmeier, Veit Hagenmeyer, Ralf Mikut, and Karl-Uwe Stucky present an interesting concept.

Click HERE for a 16 page presentation presented in November 2015.

The research focuses on the APPLICATION of Control, Monitoring, and Visualization of various aspects of energy systems (gas, electricity, heat) - not just electrical systems.

IEC 61850 is THE solution for the process instrumentation - share process information in a standardized way.

These people have understood that the focus is on applications rather than on protocols ...
The 14 Layer Cake I had after a nice dinner in Jakarta shows that the automation of the energy systems of the future is more than "just another protocol" ... applications based on standard protocols are the crucial aspects:



Hm, the cake was very delicious.

Saturday, September 10, 2016

New Work Proposal for Extending the System Configuration Language (SCL) for HMIs


IEC TC 57 has published (57/1767/NP) a proposal for extending the System Configuration Language (SCL) to provide high-level direction in terms of how best to bind the HMI graphical objects with the IEC 61850 data objects/attributes using the configuration description language defined in IEC 61850-6. It builds upon the existing System Configuration Language (SCL) defined in IEC 61850-6, in addition to possibly incorporating other non-IEC namespaces such as the W3C's Scalable Vector Graphics (SVG) namespace.

Communication networks and systems for power utility automation - Part 6xx: Configuration description language for communication in power utility automation systems related to Human Machine Interfaces (proposed IEC 61850-6xx)

This work will definitely helping to simplify the graphical representation of DataTypeTemplates in IEC 61850-6 (SCL).


A SCL DataTypeTemplate for a temperature measurement "STMP_0" could be bound to a graphical representation.



The depicted LNType has five related DataObjects. The temperature curve could be shown at an HMI as implemented in the client (HMI) interface of the VHPready demo. The VHPready demo could be downloaded. Click HERE for the access.
The client application of the demo is programmed in C#. A graphical template could be programmed ... if you need it. We could offer such a template if you are interested.


Wednesday, July 27, 2016

Could You Measure a Change in Air Flow caused by a Wind Turbine in a distance of 100 km?

Assume an air flow of x m**3 per second. What happens at your position if a big wind turbine is starting to rotate in a distance of 100 km? Do you expect that you could measure that the air flow is reduced due to the wind turbine that removes energy from the air flow? It may be possible if the turbine would be located in a huge tube. So far so good.
Another question: Could you believe "that a short-circuit at Lawrence Berkeley lab one day was observed by a micro-PMU [Phasor Measurement Units] in Los Angeles, 550 kilometers away, as a 0.002 percent dip in voltage"? It is more likely that one can measure a 0.002 percent dip in 550 km distance than a change in air flow 100 km away caused by a wind turbine.
With a network of many micro-PMUs it may be possible to figure out that somebody is switching on a computer. If you install enough micro-PMUs you may get there.
With a good power quality meter and pattern recognition I could figure out when my wife switches on the Toaster or Microwave.

Each of load (in our home or in the neighborhood) has a specific finger print. So that I could see the patterns and learn what they mean - after some training.

Some people made this observation "We're watching the volts and the amps and we’re not even inside the substation. We’re five miles away. We came up with this idea: What if we were to tell the substation operator that this substation switch is opening and closing? If they were the ones opening and closing it, that’s great. But if not, that’s a pretty good sign that there’s a cyber attack at least being experimented with.”

This is a true story (I guess).

Click HERE for a news report from IEEE Spectrum.

More Big Data to come. Be aware in your home that a power quality meter connected to the copper wire some 20 to 50 m away may be watching you. What about privacy? Is it a good thing to know (almost) everything?
"For in much wisdom is much grief; and he that increaseth knowledge increaseth sorrow." (Kohelet 1:18)


Friday, March 11, 2016

Stromnetz Berlin - Goes Digital with various approaches

The distribution operator "Stromnetz Berlin" with some 2.4 Million customers and 350.000 house service connections operates the following networks and applies various communication solutions:

110 kV Network: 
- 80 Substations with 600 switch gears
- all switch gears remote controllable
- communication infrastructure: fiber optic

10 kV Network:
- 10,700 Distribution stations with 23,000 switch gears
- 10 per cent of switchgears remote controllable
- expandable to 100 per cent
- communication infrastructure: land line, TETRA Radio

0,4 kV Network:
- 15,000 cable distributor boxes
- 96,000 feeders
- 1 per cent of switch gears remote controllable
- expandable to 100 per cent
- communication infrastructure: pager (e*nergy - based on e*message)

The protocols used are likely quite different - I guess.
Click HERE to download a presentation from "Stromnetz Berlin" [German only]
Click HERE for the presentation material (14 slide presentations) of a recent conference [German only]

Saturday, March 7, 2015

Are you prepared for the Solar Eclipse 2015 on March 20?

Why raise such a question on this blog that is about standards like IEC 60870-5-104 and IEC 61850 …? These are two good questions. Let’s discuss them briefly.

The Solar Eclipse 2015 and its impact on the power transmission system is discussed these days. The crucial issue is the minute-to-minute power gradient that may exceed between minus 400 MW/minute and plus 700 MW/minute; the highest gradient occurs when the PV in-feed returns at the end of the phase. This gradient may be managed by the TSO or not – who knows. We know it at lunch time on March 20, 2015.

There are many recommendations on the web, how to get prepared: having water, food, … for up to 10 days or so … I hope we will not need these.

@Question 2:

There is a need for the TSOs (just four in Germany!) to relay on good measurements from all-over in the grid and secure control possibilities to manage power plant in-feeds and substations. I guess they have good communication systems they can trust. These systems have been developed over many decades. They are tested and run reliably. Still. But what happens in future where we will have hundreds or millions of technical systems (embedded controllers …) that contribute to the system view and management?? Is this an issue at all?

Yes, it is a crucial issue. Let me discuss the following real-life incident reported last week:

A gateway in a virtual power plant provides the measured load on the network connection point of a CHP (combined heat and power) system. Normally the CHP feeds power into the network. But all in a sudden the VPP/TSO received a signal telling them a jump of the load from 0 MW to 600 MW!! Should the control center responsible for that part of the grid act or not? Hm. If this would be a real jump then it would have to react.

(Un)Fortunately the 600 MW jump was just a jump in the Value communicated!! It was caused by an error in the gateway (RTU kind of device). Was this value plausible? No. Because the CHP could just feed-in – not draw that much power from the grid.

With IEC 61850 in place we could easily expose the limits of power production and load. The logical node MMXU could be used for the limits in which a value is valid:

Data Object TotW of class MV (measured value) - Total active power (total P)

could provide the actual value, quality, range and the limits in the details provided through the MV CDC:

instMag.f AnalogueValue coded as floating point
q Quality
range ENUMERATED normal|high|low|high-high|low-low (out of range would change quality value)
rangeC RangeConfig:
hhLim
hLim
lLim
llLim
min
max

min: the min (minimum) attribute shall represent the minimum process measurement for which values of i or f are considered within process limits. If the value is lower, q shall be set accordingly (validity = questionable, detailQual = outOfRange).

max: the max (maximum) attribute shall represent the maximum process measurement for which values of i or f are considered within process limits. If the value is higher, q shall be set accordingly (validity = questionable, detailQual = outOfRange).

In our case, the TotW for the CHP generator may be limited between 0 W (min) and 35 kW (max). A value of “minus 600” MW would have to be flagged as questionable and outOfRange !! Negative values and values higher than 35 kW would be flagged out of range!

The receiver (a control center) could check the limits of the values (either by reading the range configuration online by a service or getting it from the corresponding SCL file). It could figure out that the range is 0-35 kW. Even if the gateway (RTU) would send “minus 600” MW (load) … the CC could understand that this is a bad value – recommended not to use.

The meta-data of the measured value serve as a means to help interpreting the plausibility of a value communicated.

IEC 61850 models add very useful information to help (a bit) keeping the power flowing. There are many other physical issues to take into account … but information and information exchange plays a crucial role!

Tuesday, December 2, 2014

Monitoring the Battery of the Boeing Dreamliner 787 would have helped to prevent damages

I guess you remember the trouble Boeing was faced with when the huge battery packs in the Dreamliner 787 some two years ago. The Auxiliary Power Unit Battery Fire was likely caused by several severe “cell internal short circuiting and the potential for thermal runaway of one or more battery cells, fire, explosion, and flammable electrolyte release”.

More precise Condition Monitoring would have helped to prevent such incidents – and would have shown very early that the design of the battery system was quite fragile.

One of the findings (page 91 of the released incident report) is:

“More accurate cell temperature measurements and enhanced temperature and voltage monitoring and recording could help ensure that excessive cell temperatures resulting from localized or other sources of heating could be detected and addressed in a timely manner to minimize cell damage.”

Click HERE for the complete official NTSB report.

Monitoring batteries is very crucial the more our life depends on these systems – in airplanes, in substations, power stations, mobile systems, communication infrastructure … It is not sufficient to have a battery – the batteries must be maintained, tested from time to time, and monitored continuously.

Two groups (I am aware of) have defined Battery Monitoring information models:

1. IEC 61850-90-9 (Use of IEC 61850 for Electrical Storage Systems)

Excerpt of the battery system (without further discussion):

image

2. IETF EMAN (Energy Management)

Definition of Managed Objects for Battery Monitoring / draft-ietf-eman-battery-mib-13

image

Click HERE for the EMAN draft for Battery Monitoring.

Battery monitoring could safe life!

Tuesday, November 18, 2014

New Models for Condition Monitoring: IEC 61850-90-3

IEC TC 57 just published a very comprehensive document (draft technical report, 57/1522/DTR) of 150 pages that suggests a lot of new models:

IEC 61850-90-3 TR:
Communication networks and systems for power utility automation –
Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis

The CMD (Condition Monitoring Diagnosis) which diagnoses power grid health status has been one of the major issues to improve the reliability of the power system by preventing a potential failure in advance. Since too many different information modeling, information exchange, and configuration techniques for CMD in various forms from many vendors are currently used, they need to be standardized in TC57.

The new document contains a lot of new Logical Nodes and Data Objects like for:

  • GIS (Gas Insulated Switchgear)
  • Transformer
  • Load Tap Changer (LTC)
  • Under Ground Cable (UGC)
  • Transmission Line (TL)
  • Auxiliary Power System

Example of an extension of the very common Model for a tank (KTNK):

LevMaxSet - Maximum level reached setting
LevHlfSet - Half level reached setting
LevMinSet - Minimum level reached setting

LevMax - Maximum level reached
LevHlf - Half level reached
LevMin - Minimum level reached

Voting terminates on 2015-01-16

More to come.

Tuesday, November 4, 2014

IEC 61850 in Hydro Power Plants

I have been asked recently about the application of IEC 61850 in Hydro Power Plants. Yes, there is growing interest to apply IEC 61850 conformant monitoring and control systems in the hydro domain.

A nice presentation from (Ingeteam Power Technology S.A.) with the title

HYDROELECTRIC POWER PLANTS AUTOMATION USING IEC 61850:
EXPERIENCES AND IMPROVEMENTS FOR THE USER
presented in April 2014

closes with the statement that “IEC 61850 is a valid solution for hydro power plant automation … More than 10 IEC 61850 hydro projects mainly in Spain.”

Click HERE for a nice presentation [pdf, 0.5 MB]

The use of IEC 61850 for conventional power plants is also growing. I have conducted several training courses in 2014 for engineers working in the power plant business.

Be sure: More to come.

Monday, July 21, 2014

Just published: Draft 61850-90-17 – Using IEC 61850 to transmit power quality data

IEC TC 57 has just published the 52 page Draft IEC Technical Report 61850-90-17 – Using IEC 61850 to transmit power quality data (57/1488/DC).

The document is available for comments until 2014-10-10.

Contact your TC 57 National Committee for a copy.

Phenomena considered in the draft are related to:

  • Power frequency
  • Magnitude of the supply voltage
  • Flicker
  • Supply voltage dips and swells.
  • Voltage interruptions
  • Transient voltages
  • Supply voltage unbalance
  • Voltage harmonics
  • Voltage interharmonics
  • Mains signalling voltage on the supply voltage
  • Rapid Voltage Changes (RVC)
  • Underdeviation and overdeviation
  • Magnitude of current
  • Current recording
  • Harmonic currents
  • Interharmonic currents
  • Current unbalance
  • Frequency deviation
  • Supply voltage variations
  • Voltage unbalance
  • Harmonic voltage
  • Interharmonic voltage
  • Voltage fluctuation and flicker
  • Mains signalling and voltages

This draft is intended to increase the interoperability between power quality monitoring systems and any application that needs the corresponding information for operation or post mortem analysis.

Thursday, March 6, 2014

Brief EPRI Report on Standards of DistribuTech 2014

EPRI has published a Brief Report of DistribuTECH 2014.

It seems that a hot topic was “DATA” … data from everywhere of everything! Sure there is a need to share the pool of “Big Data”. I have heard about a SCADA project that receives Terra Bytes of “big Data” from a huge wind power park trough IEC 61400-25. This seems to be “Big Data” and “little information” … good for hardware manufacturers.

The EPRI Brief reports from the DistribuTech 2014:

“This was also another good year for standards. The vendor community has heard loud and clear that standards are a preference of electric utilities and the vendors have done a good job of promoting where they are using standards including DNP3, IEC 61850, IEC 61968/61970 (the CIM), MultiSpeak, and more. One relatively new standard that had a strong presence was OpenADR (Open Automatic Demand Response).”

Click HERE for the complete report.

I hope that they are looking at useful information rather than bunches of Data – that just may tell the receiver: nothing has changed, nothing has changed, nothing has changed, … stop here and make it smarter:

image

This is one aspect of the philosophy of IEC 61850 – which needs to be understood by more people … it will take some time to understand this.

Wednesday, October 2, 2013

How do you know which IEC 61850 Information Models are published or underway for publication?

Information models in IEC 61850 are growing very fast. Many groups have understood that one of the benefits of IEC 61850 is this: Information Models for real world information (measurements, status, configuration, limits, control, …).

One crucial question is this: Where can you get an overview and introduction in the many models already published or those models underway? There are several groups extending the models for several applications inside and outside electrical substations.

The easiest way is to ask somebody that has a good overview and long-term experience with IEC 61850 …

One of the crucial extensions is defined in the draft IEC 61850-90-3. During a training course I was asked last week if IEC 61850 defines something for overhead line monitoring – he did not have a chance to easily figure out that there is one document under preparation … sure you usually don’t know it or don’t find some documentation.

The following figure gives a brief overview about the various aspects of line monitoring:

image

Want to learn more on the 300+ Logical Node classes defined so far? Please contact NettedAutomation … or attend the next training course in Frankfurt/Germany on 16-18 October 2013.

You have the chance to learn the basics AND the most crucial definitions of the standards and how they could be used. See you there.

The aging infrastructure and aging work force requires more sensors to make sure that the power is flowing reliably in the future! Almost every day you can read stories about breaking infrastructure.

Wednesday, September 25, 2013

Merging Unit and Monitoring IED with IEC 61850 Server and I/Os

The Merging Unit MU320 offered by Reason combines the Sampled Value exchange with “conventional” Inputs and Outputs using GOOSE and Client/Server communication. This device seems to be a very convenient way to combine both worlds: real-time and general SCADA applications:

  • 9-2LE compliant
  • Up to 16 analog inputs, 12 binary inputs and 16 outputs
  • Support for Protection and Measurement (metering) profiles simultaneously
  • MMS monitoring and control
  • Binary inputs and outputs via GOOSE messages
  • Synchronization via Ethernet using PTP (IEEE1588)
  • Parameter setting using standard data model and SCL language

Click HERE for a more detailed description.

Wednesday, May 1, 2013

Optical Fibre for Temperature Measurement in Power Systems

Optical fibres are known to be used in power systems because they withstand the rough conditions in high voltage environments – as such they are used in Substations for carrying messages, e.g., according to IEC 61850.

There is another very interesting use case of optical fibres in power systems: in generation, transport, distribution, and loads. One of the crucial measurements that can be applied to more efficiently use of electric power is measuring temperatures. But you may state that installing a lot of temperature sensors could be quite expensive!

With the application of optical fibre for measuring temperatures it seems to be a very promising approach to reduce the amount of power needed for many critical process like in huge data centers, high voltage lines and cables, transformers, switch gears, to name a few.

According to alquist (a UK based company specializing on measurement systems using fibres) there are many advantages of fibre as a temperature sensor:

  • Simultaneously measures temperature and position over long distances
  • Low cost – the sensor is made from standard 50/125 optical fibre zip cord - very cost effective
  • Immune to shock/vibration and electromagnetic interference
  • No electronics, wireless, batteries or moving parts in monitoring zone. Totally passive, minimal maintenance.
  • Inherent high reliability (fibre has a design life of 30+ years)
  • High temperature range -200°c to +500°c
  • Extremely small for access in legacy areas with restricted space
  • Easily installed in without any downtime or interruption of service

There are an incredible number of applications for fibre optics beyond their use as a simple communications links.

Download a very useful presentation given by Andrew Jones (alquist) [pdf, 2.8 MB]

The availability of myriads of “measurement signals” from various processes allows to more efficiently use energy, i.e., to reduce the amount of energy we need to consume to service our needs for modern life.

What ever will be measured in energy supply systems could be modeled and communicated with IEC 61850 – The Communication Standard for power system automation. One crucial focus of IEC 61850 is on measurements!