Showing posts with label meter. Show all posts
Showing posts with label meter. Show all posts

Tuesday, October 18, 2016

IEC-61850-Seminar in Karlsruhe vom 06.-09. Dezember 2016 zu Einem Unschlagbarem Preis

Wir bieten vom
06.-09. Dezember 2016 in Karlsruhe ein IEC-61850-Intensiv-Seminar an
Die drei (3) Blöcke (1 Tag + 2 Tage + 1 Tag) können einzeln oder in Kombination gebucht werden. Sie entscheiden selbst, ob Sie nur einen Tag von Ihrem Arbeitsplatz fern bleiben möchten oder zwei, drei oder vier. Je nachdem, welche Zeit und welchen Bedarf Sie haben.

Am ersten Tag wird ein Überblick über das Normungsumfeld und die einzelnen Normen gegeben. Im Mittelpunkt stehen dabei die grundlegenden Eigenschaften und Bedeutung der Normenreihe IEC 61850 für Systemdesign, System- und Geräteengineering, Datenmodellierung, Datenmodelle (Schutz, Messwerte, Steuerungen, Power Quality Monitoring, Wind Power, Hydro Power, Dezentrale Erzeuger, ...), Kommunikationsmöglichkeiten (Client/Server, Publisher/Subscriber) und Sicherheitslösungen (IEC 62351).
Der Vergleich mit IEC 60870-5-104, DNP3, Modbus und Feldbussen rundet den ersten Tag ab.

Am zweiten Tag werden die Modellierungsmethode, die vielfältigen Modelle (Logische Knoten), die Kommunikationsdienste und -protokolle und die System-Konfigurations-Sprache (SCL) im Detail vorgestellt. Die Lösungen nach VHPready und FNN-Steuerbox werden präsentiert und diskutiert.

Am dritten Tag werden anhand vieler praktischer SCL-Beispiele Systembeschreibungen (SSD), Systemkonfigurationen (SCD), Gerätekonfigurationen (ICD und CID für Server/Publisher, Client/Subscriber und Server/Subscriber) diskutiert, erstellt und formal geprüft. Dabei kommt eine Reihe von Werkzeugen und Geräten zum Einsatz.

Am vierten Tag wird das Erlernte in praktischen Übungen mit marktgängigen Steuerungsgeräten, Gateways und Werkzeugen vertieft. Eine Windows-Evaluierungspaket mit Client, Server, GOOSE-Publisher, Client/GOOSE-Subscriber und Server/GOOSE-Subscriber wird allen Teilnehmern kostenlos zur Verfügung gestellt; dieses Paket kann auch nach dem Seminar noch genutzt werden.
Und viels andere mehr. 
Eine Spezialität unserer Seminare ist, dass die Teilnehmer zu Wort kommen: Fragen, Erfahrungen, Bedenken, Berichten über gelungene und weniger gelungene Projekte!
Es erwartet Sie ein lebhafter Dialog zwischen dem Referenten und den Teilnehmern.
Sie können den 1. Tag, den 2. und 3. Tag sowie den 4. Tag getrennt oder in jeder Kombination buchen!
Mit unserer Schulung bereiten wir Sie hervorragend auf neue Herausforderungen vor!

Klicken Sie HIER, um mehr Details und die Anmeldeinformationen herunterzuladen [pdf, 320 KB].

Reservieren Sie noch heute Ihren Platz!

Die mehr als 4.100 Teilnehmer meiner über 230 Seminare seit 2004 würden sicher alle bestätigen, dass das komplexe Thema IEC 61850 unbedingt eine geeignete Schulung verlangt -- und dass wir eine erst-klassische und einzigartige Schulung bieten! Zu einem unschlagbaren Preis! Garantiert!
Es erwartet Sie Erfahrungen mit hunderten von Firmen und Organisationen!

Friday, March 11, 2016

Stromnetz Berlin - Goes Digital with various approaches

The distribution operator "Stromnetz Berlin" with some 2.4 Million customers and 350.000 house service connections operates the following networks and applies various communication solutions:

110 kV Network: 
- 80 Substations with 600 switch gears
- all switch gears remote controllable
- communication infrastructure: fiber optic

10 kV Network:
- 10,700 Distribution stations with 23,000 switch gears
- 10 per cent of switchgears remote controllable
- expandable to 100 per cent
- communication infrastructure: land line, TETRA Radio

0,4 kV Network:
- 15,000 cable distributor boxes
- 96,000 feeders
- 1 per cent of switch gears remote controllable
- expandable to 100 per cent
- communication infrastructure: pager (e*nergy - based on e*message)

The protocols used are likely quite different - I guess.
Click HERE to download a presentation from "Stromnetz Berlin" [German only]
Click HERE for the presentation material (14 slide presentations) of a recent conference [German only]

Tuesday, August 4, 2015

IEC 61850-80-4 Translation from COSEM to IEC 61850

IEC TC 57 just published the draft Technical Specification (57/1602/DTS):

IEC 61850-80-4 TS:
Communication networks and systems for power utility automation –
Part 80-4: Translation from COSEM object model (IEC 62056) to the IEC 61850 data model

Voting terminates on 2015-10-30

This part defines the one-to-one relationship of IEC 62056 OBIS codes to IEC 61850 Logical Nodes. The purpose is to increase the availability of revenue meter information to other applications defined within the IEC 61850 framework. This increased visibility will contribute to information available for smart grid applications.

Friday, October 10, 2014

HMS offers IEC 60870-5-104 and IEC 61850 Gateway

HMS is a well known company in the world of communication solutions for any kind of Automation in factories, chemical plants, ... HMS is active in more than 50 countries, with some 350 employees, with the head office in Halmstad (Sweden).

HMS has understood the importance of the standards IEC 60870-5-104 and IEC 61850: Their latest offering are new Gateways under the Product line LABLINE SG. The new products are applicable in any Smart Grid application like Photo Voltaic, Wind Power, CHP, Backup Power, Metering, Power Quality, … and beyond:

image

Click HERE for more information in German and English.

Sunday, August 4, 2013

Could a Counter Interrogation Service bring the European Power or Gas Networks down?

Good question! Easy to answer: Yes! It depends on the standard and implementation used.

Early May 2013 it almost happened in Europe. What? During a test of a new control center communication and application an IEC 60870-5-101 or –104 Broadcast “Counter interrogation” command went out to interrogate counters from ALL RTUs somehow “connected”. The command was received and answered by all these RTUs. Obviously one RTU responded with a “Broadcast” response … and obviously there was a “loop” somewhere in the network … it ended up in flooding the network for days!!!

The operators had very severe problems to get status and measurements from the process – because first the network was sending bunches of messages back and forth and around. Second, when experts started to “break” the “loops” and disconnect from the neighboring network they could “cool” down the traffic but lost some awareness of the system’s situation. After a few days they fixed some software … but they did not yet find the device that caused the trouble. According to a report from experts involved.

Hm!? That’s really a crucial issue with a standard protocol in operation for 15 or 20 years.

Here is why this could happen at all: During the days IEC 60870-5-101 was designed, people thought that the communication is strictly hierarchical and looks like a tree (top-down) – see next figure from 101: 

image

For counter interrogation the broadcast is often used in order to catch the counter values at a certain time, let’s say 20:00 h. To freeze the value at 20:00 h the control center has to send out a broadcast counter interrogation to freeze the value at 20:00 h (+/- some seconds – due to travel time …).

Next it can send another command to start sending the values from the RTUs to the control center.

That means: A lot of messages have to be sent at the same time … to reach all RTUs … in star topologies, or “looped” networks, … how to control such a process if you have hundreds of RTUs … owned by different utilities … blablabla …

The issue is here: People thought that you could start system-wide synchronous functions by synchronizing through timeliness messages. That may work in simple topologies … but … in Smart Grid systems with many (many) meters, it is unlikely that this approach will work reliably.

How does IEC 61850 solve that requirement? It defines a concept of time-wise synchronized RTUs (or generally speaking IEDs). The control center can send a command to freeze well in advance – an hour or two … so that no message shower will occur around 20:00 h. The IEC 61850 server stores the time when it has to freeze the corresponding value(s). The server can then send the frozen values via a data set and report control block, or can the data set or log it.

The synchronization is completely decoupled from the freezing and retrieving process.

The process is configured using the common data class BCR (Binary Counter Reading):

image

This model really is based on the (bad) experience with 101 and 104 … and … it works … and does not flood the network!

The broadcast command in 101 and 104 SHOULD be REMOVED … at least utilities should no longer rely on it!!! Take this very serious … as many other utility experts do.

Wednesday, July 17, 2013

Mapping between DLMS/COSEM and IEC 61850

A first draft has been written describing the mapping between DLMS/COSEM and IEC 61850:

80-4: Mapping between the DLMS/COSEM (IEC 62056) data models and the IEC 61850 data models

It defines a one-to-one relationship between IEC 62056 OBIS codes and IEC 61850 Logical Nodes and Data Objects.

Tuesday, August 21, 2012

New Work Item Proposal – Mapping between DLMS/COSEM (IEC 62056) data models and IEC 61850 data models

It was just a matter of time before an official work item was suggested to look into some kind of “co-operation” of information models developed for metering data (DLMS/COSEM, IEC 62056) and power system automation (IEC 61850).

Here is the proposal: IEC TC 57/1276/NP with the title:

“Mapping between the DLMS/COSEM (IEC 62056) data models and the IEC 61850 data models”

The ballot closes 2012-11-23.

Data derived from current and voltage and other sensors play an important role in the electric delivery system: on all voltage levels and all over!

With more needs for monitoring and controlling the system, substation automation functionality will be needed at any voltage level. It would be an advantage if automation functions could tap information provided by revenue meters.

A crucial objective is to find out and document which data objects can be used from the revenue meter and how these data objects map into the IEC 61850 information model.

This activity shows that IEC 61850 (originally positioned at medium and high voltage substations) is a kind of a core technology for more and more applications throughout the electric power delivery system. It has the potential to uniquely bridge the gap between islands of information found in systems providing electric power (utilities, factories, power plants, …).

Models like the IEC 61850 MMXU are universally applicable to any voltage level of an A.C. electrical system.

Friday, November 25, 2011

Easy Smart Metering and IEC 61850 MUC (Multi Utility Communication)

Solvimus (Ilmenau, Germany) offers an Easy Smart Metering and IEC 61850 MUC (Multi Utility Communication) device – combining metering and IEC 61850.

The MUC.easy(TM) supports:

  • M-Bus, wM-Bus, RS-232, RS-485, S0, or CL to connect to meters
  • Integrated Webserver
  • GSM/GPRS
  • Ethernet
  • DSL
  • Powerline Communciation (PLC), and
  • a powerful embedded IEC 61850 solution

Click HERE for the News in German.
Click HERE for some overview of the MUC with IEC 61850