Tuesday, December 16, 2014

IEC 61850 in Hydro Power Plants (additional information)

Recently I have reported about an example of the use of IEC 61850 in hydro power plant.

As I said then: “Be sure: More to come.” has become true. Additional information can be found here:

Efacec IEC 61850 automation system is in operation since 2013:

Document 1 (Products)
Document 2 (Projects)
Document 3 (Why IEC 61850?)

Founded in 1948, but with a century-long history, Efacec is the largest Group in the electric field financed by Portuguese capital. It employs over 3900 people and is present in more than 65 countries, in five continents.

Other vendors will follow soon.

NettedAutomation’s regular IEC 61850 Courses extended to 2 + 2 Days

NettedAutomation GmbH has updated the course agenda early 2014. For 2015 the training will be upgraded: using real devices and solutions (including protection relays and testing equipment) to work with during the public 2+2 days general training course.

Reorganized, extended and improved program for the 2 +2 days course:

  • 1 1/2 days Introduction and Basics
  • 1/2 day Hands-on training on SCL

Hands-on training group 1 (SCADA):

  • 1 day Configuring and using Server devices for monitoring and control
  • 1 day Configuring and using Client devices for IEC 61850 and gateways

Hands-on training group 2 (Protection; parallel to group 1) - by Andrea Bonetti (FMTP):

  • 2 days Impact of IEC 61850 on Protection (using real protection relays, ...

The next courses are scheduled for

05.-08. May 2015 Frankfurt (Germany)
13.-16. October 2014 Frankfurt (Germany)

Click HERE for details, program and registration information.

Many NEW IEC 618850 Training courses in 2015 – especially for protection engineers

More than 10 years after the first substation have been equipped with IEC 61850 conformant devices, we see now the need for more education. Several new trainers have entered the market.

BUT: What about training for the most crucial engineers in the power delivery system: Advanced education of the many protection engineers? They need much more than to understand protocols (MMS, GOOSE, SV) and the configuration language! They need to understand how IEC 61850 impacts the whole protection system: When and HOW to use GOOSE for breaker failure protection? How implement interlocking schemas? And how to test systems based on IEC 61850?!? How to … What you should not do! We could answer all your questions.

These and many other questions MUST be answered by real protection engineers. One of the few well (with IEC 61850 experienced) protection engineers is Andrea Bonetti (FMTP). Andrea spent part of his time in Substations!! Watch his introduction in a 5 min video.

After the first joined course for protection and SCADA engineers in Prague last week, NettedAutomation and FMTP offer several new courses especially for protection and SCADA engineers during the next months:

26-29 January 2015
Guayaquil (Ecuador)

16-18 February 2015
Brussels (Belgium)

09-11 March 2015
Berlin (Germany)

27-29 April 2015
Hong Kong

18-20 May 2015
Bratislava (Slovakia)

Click HERE for details, program, and registration information.

Other dates and locations are under preparation.

Friday, December 12, 2014

Protection and Control with IEC 61850 – Very Successful Training in Prague (CZ)

Two crucial application domains for IEC 61850 are the Power Protection and Power Control – no doubt. What does this mean for the electrical engineers responsible for the reliability of the Power System? A lot!

The first 3 days joint Seminar of FMTP Power and NettedAutomation in Prague, CZ, (8-10 December 2014) was very successful. The Training was held in the Holiday Inn (Congress).

image 

The 3 days were split between presentations and demonstrations of general IEC 61850 issues and special protection issues. The main topics were centered around the impact of IEC 61850 on the protection. Andrea Bonetti (FMTP) used several test tools from ABB and Megger, as well as an ABB protection relay (REL 670):

image

Andrea is one of the developers of the ABB series 670 and the Megger GOOSER. He really knows what he is talking about – when it comes to protection.

The attendees were absolute happy with the many lessons learned during the three days fully packed with experience. Note that Andrea has spent some time of his life in substations – many days and nights … listen to him next time:

Ecuador, Jan 26-29, 2015
Brussels, Feb 16-18, 2015
China, March 9-11, 2015
Bratislava, Apr 20-22, 2015
Berlin, May 18-20, 2015

Additional courses are in preparation.

Draft TR IEC 61850-90-2 Substation to Control Center Communication published

The Draft IEC Technical Report: IEC TR 61850-90-2 – Use of IEC 61850 for the communication between substations and control centres

has been published under 57/1507/DC dated 2014-09-26

This technical report provides a comprehensive overview of the matters that need to be
considered in order to use IEC 61850 for information exchange between substations and control or maintenance systems.

Thursday, December 4, 2014

Fertigungsautomatisierung und Smart Grids

Die Anforderungen an die Kommunikationstechnik in den künftigen Energienetzen ähneln denen in der Fertigungsautomatisierung: Sowohl für die Industrie als auch für die elektrische Energieversorgung ist eine sichere, robuste und zuverlässige Kommunikationstechnik unerlässlich.

In der elektrischen Energietechnik werden Normen wie IEC 60870-5-104 und IEC 61850 immer häufiger in Ausschreibungen verbindlich vorgeschrieben. Auch in Fertigungsanlagen spielt die elektrische Energie eine zunehmende Bedeutung (Energiemanagement, Energieeffizienz). Eine schier unendliche Anzahl von Prozessdaten wird über eine Vielzahl von Feldbussen bereits heute feldbus-spezifisch gesammelt. Wie kommen diese Daten in die Leitsysteme der elektrischen Versorgungssysteme?

Ganz einfach: über Gateways, die den Anschluss nach “oben” herstellen!

HMS hat auf der Messe SPS/IPC/Drives letzte Woche in Nürnberg im HMS Innovation Corner gezeigt, wie das mit einfachen Mitteln zu bewerkstelligen ist:

 image

… mit Gateways zu allen relevanten Feldbussen:

image

In einem Beitrag in der “Energy & Technik” hat Herr Garcés von HMS das Thema näher beschrieben:

  • In Smart Grids wie in der Industrie kommunizieren (Teil 1, mit Link zu Teil 2)
  • Von IEC-61850-Profilen profitieren (Teil 2, Link zu Teil 3)
  • Gateways von der Industrie für Smart Grids (Teil 3, Link zu Teil 4)
  • »SG-gateway«-Familie  (Teil 4)

    Über die Gateways wächst zusammen, was zusammengehört: Die Energieinformationen aller Ebenen von der Erzeugung, über den Transport, die Verteilung UND NUTZUNG (in allen Bereichen!).

  • VHPready English Website

    The Industry Alliance VHPready e.V. is happy to announce that the English website is now online:

    www.vhpready.com

    The industry alliance VHPready e.V. is committed to the realization of the energy transition (“Energiewende”) by creating and using a standardized network of decentralized energy systems.

    Standards like IEC 60870-5-104 and IEC 61850 will build the core of the communication system.

    The group is growing quite fast … 25 Members (per 2015-01-01) are supporting the crucial idea that we need standardized information and information exchange in the future energy domain.

    New Editions for IEC 60870-6 TASE.2 (ICCP) Parts

    IEC 60870-6 TASE.2 (ICCP) is a series of standards that are used for communication between control centers. The first parts have been published in the 90s. In the meantime a lot of experiences have been made. These experiences have issued the revision of the documents.

    For the following three parts new Editions have been published:

    IEC 60870-6-503:2014 Edition 3.0 (2014-07-15)

    Telecontrol equipment and systems - Part 6-503: Telecontrol protocols compatible with ISO standards and ITU-T recommendations -
    TASE.2 Services and protocol

    IEC 60870-6-702:2014 Edition 2.0 (2014-07-15)

    Telecontrol equipment and systems - Part 6-702: Telecontrol protocols compatible with ISO standards and ITU-T recommendations -
    Functional profile for providing the TASE.2 application service in end systems

    IEC 60870-6-802:2014 Edition 3.0 (2014-07-15)

    Telecontrol equipment and systems - Part 6-802: Telecontrol protocols compatible with ISO standards and ITU-T recommendations -
    TASE.2 Object models

    Please note that the basic technology used for TASE.2 is the same as for IEC 61850:
    MMS (ISO 9506).

    Tuesday, December 2, 2014

    Monitoring the Battery of the Boeing Dreamliner 787 would have helped to prevent damages

    I guess you remember the trouble Boeing was faced with when the huge battery packs in the Dreamliner 787 some two years ago. The Auxiliary Power Unit Battery Fire was likely caused by several severe “cell internal short circuiting and the potential for thermal runaway of one or more battery cells, fire, explosion, and flammable electrolyte release”.

    More precise Condition Monitoring would have helped to prevent such incidents – and would have shown very early that the design of the battery system was quite fragile.

    One of the findings (page 91 of the released incident report) is:

    “More accurate cell temperature measurements and enhanced temperature and voltage monitoring and recording could help ensure that excessive cell temperatures resulting from localized or other sources of heating could be detected and addressed in a timely manner to minimize cell damage.”

    Click HERE for the complete official NTSB report.

    Monitoring batteries is very crucial the more our life depends on these systems – in airplanes, in substations, power stations, mobile systems, communication infrastructure … It is not sufficient to have a battery – the batteries must be maintained, tested from time to time, and monitored continuously.

    Two groups (I am aware of) have defined Battery Monitoring information models:

    1. IEC 61850-90-9 (Use of IEC 61850 for Electrical Storage Systems)

    Excerpt of the battery system (without further discussion):

    image

    2. IETF EMAN (Energy Management)

    Definition of Managed Objects for Battery Monitoring / draft-ietf-eman-battery-mib-13

    image

    Click HERE for the EMAN draft for Battery Monitoring.

    Battery monitoring could safe life!

    Monday, December 1, 2014

    NEW DATE for IEC 61850 Seminar in Ecuador: 26.-29. January 2015

    Please note the new date for the IEC 61850 Seminar for Protection and Control is scheduled for:

    26 - 29 JANUARY 2015

    LOCATION: GUAYAQUIL (ECUADOR)

    The focus is on protection and control in HV/MV substations using typical Relays, Tools, GOOSE, SV, SCADA and SCL Language

    Click HERE for details and registration information.

    Wednesday, November 26, 2014

    IEC 61850 Protection & Control Seminar on 8-10 December in Prague: GET a 25 per cent last call Discount

    As a kind of an early Seasonal gift, you could receive a 25 per cent discount of the attendance fee for the following seminar:

    PROTECTION AND CONTROL WITH IEC 61850

    3 DAYS SEMINAR WITH PRACTICAL DEMONSTRATIONS

    PRAGUE, CZECH REPUBLIC, DECEMBER 8TH – 10TH

    With focus on protection and control in HV/MV substations using GOOSE, SV, SCADA and SCL Language

    Teachers:
    Mr. Andrea Bonetti (FMTP Power AB)
    Mr. Karlheinz Schwarz (NettedAutomation GmbH)

    Click HERE to receive a 25 per cent discounted attendance fee [pdf, 530 KB]

    Friday, November 21, 2014

    Can IEC 61850 be Applied in the Industrial Automation Domain?

    Sure: It can. Why? Because IEC 61850 uses native standards like Ethernet, Ethertype, TCP/IP, UDP/IP, XML, MMS, … defines a dictionary of common information models, like MMXU (electrical measurements of a 3-phase AC system) that are applicable wherever a 3-phase AC System provides measurements like phase voltage or phase-to-phase voltages.

    A motor with 3 phases is a motor with 3 phases everywhere! Or?

    A very interesting paper by Dustin Tessier (Canada) discusses that IEC 61850 could be used in the power and industrial domain:

    The Dual-Domains of IEC 61850 – Power vs Industrial Domains

    “ … Despite the popular belief that the “power” domain and “industrial” domain have
    intrinsically unique principles, this paper suggests the gap is decreasing, and through the
    use of IEC 61850 we can adopt a single strategy that capitalizes on a common
    technology platform.

    … Whether it’s the SAS, DCS or PLC applications, these all share a common goal of collecting, processing, distributing and visualizing the data.

    … No longer is the day where we ask, "Is this an industrial product or a utility
    product?,
    and the same applies to system integration services. IEC 61850 may have been
    designed for the power domain, but it won't be long before we see it revolutionize the
    industrial domain
    .”

    Click HERE for the paper [pdf, 100 KB]

    Wherever there is electricity, IEC 61850 will be be involved one way or the other!

    Click HERE for further discussion on the topic: Industrial and Power domain.

    Tuesday, November 18, 2014

    New Models for Condition Monitoring: IEC 61850-90-3

    IEC TC 57 just published a very comprehensive document (draft technical report, 57/1522/DTR) of 150 pages that suggests a lot of new models:

    IEC 61850-90-3 TR:
    Communication networks and systems for power utility automation –
    Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis

    The CMD (Condition Monitoring Diagnosis) which diagnoses power grid health status has been one of the major issues to improve the reliability of the power system by preventing a potential failure in advance. Since too many different information modeling, information exchange, and configuration techniques for CMD in various forms from many vendors are currently used, they need to be standardized in TC57.

    The new document contains a lot of new Logical Nodes and Data Objects like for:

    • GIS (Gas Insulated Switchgear)
    • Transformer
    • Load Tap Changer (LTC)
    • Under Ground Cable (UGC)
    • Transmission Line (TL)
    • Auxiliary Power System

    Example of an extension of the very common Model for a tank (KTNK):

    LevMaxSet - Maximum level reached setting
    LevHlfSet - Half level reached setting
    LevMinSet - Minimum level reached setting

    LevMax - Maximum level reached
    LevHlf - Half level reached
    LevMin - Minimum level reached

    Voting terminates on 2015-01-16

    More to come.

    COSEM Object Model (IEC 62056) carried with IEC 61850 Data Model

    IEC TC 57 has just published a very interesting new draft (57/1521/CD):

    IEC 61850-80-4 TS:
    Communication networks and systems for power utility automation - Part 80-4:
    Translation from COSEM object model (IEC 62056) to the IEC 61850 data model

    The IEC 61850 is already THE international Standard series when it comes to (electric) power applications and information modeling and exchange. Metering Information is quite often exchanged with DLMS and COSEM:

    COSEM (Companion Specification for Energy Metering) is part of the DLMS (Device Language Message Specification)

    This information needs to be “fed” into the IEC 61850 world. That is done by defining how the corresponding COSEM information can be wrapped with IEC 61850 Logical Nodes and Data Objects. The title says: Translated … which means the same.

    Here is an example:

    IEC 61850 Data

    COSEM OBIS Code

    Explanation

    TotVAh

    (1-b:9.8.0.255) – (1-b:10.8.0.255)

    Net apparent energy

    TotWh

    1-b:1.8.0.255 - 1-b:2.8.0.255 (¦+A¦ - ¦-A¦)

    Net real energy

    TotVArh

    1-b:3.8.0.255 - 1-b:4.8.0.255 (¦+R¦ - ¦-R¦)

    Net reactive energy

    SupWh

    1-b:1.8.0.255 (+A)

    Real energy supply (default supply direction: energy flow towards busbar and is equivalent to Energy Export[+])

    SupVArh

    1-b:3.8.0.255 (+R)

    Reactive energy supply (default supply direction: energy flow towards busbar and is equivalent to Energy Export[+])

    DmdWh

    1-b:2.8.0.255 (-A)

    Real energy demand (default demand direction: energy flow from busbar away and is equivalent to Energy Import[-])

    DmdVArh

    1-b:4.8.0.255 (-R)

    Reactive energy demand (default demand direction: energy flow from busbar away and is equivalent to Energy Import[-])

    These IEC 61850 Logical Nodes are of interest for the translation:

    MMTR - Metering 3 Phase
    MMTN - Metering Single Phase
    MMXU - Measurement
    MMXN - Non-phase-related measurement
    MMDC - DC measurement
    MSQI - Sequence and imbalance
    MHAN - Non-phase-related harmonics or interharmonics
    MHAI - Harmonics or interharmonics
    MFLK - Flicker measurement

    Closing date for comments: 2015-02-20

    Wednesday, November 12, 2014

    HMS offers IEC 60870-5-104 and IEC 61850 Gateways to Industrial Communication

    Some four weeks ago I reported that HMS offers Smart Grid solutions that support building a power network for the future.

    In the meantime HMS has posted more details on their corporate website.

    One of the most interesting news is, that the LABLINE SG gateways can also communicate with industrial fieldbus or industrial Ethernet networks such as Profibus, Profinet or any other industrial network thanks to the HMS Anybus technology.

    Click HERE to link to the new web pages.

    Monday, November 10, 2014

    What does IEC 61850 mean for Power Systems?

    A lot. There are many different approaches to describe the benefits. You can start with the System Specification Description (SSD according to part IEC 61850-6, SCL) and go down to the signals and communication. Or you can describe it bottom-up. I like the bottom-up approach:

    1. Take a signal (e.g. Voltage phase A in kV) coming trough a serial Modbus (Address 12122) by polling into an IEC 61850 Server device
    2. Give it a NAME (MyMMXU1.PhV.phsA) based on a STANDARDIZED Structure (Logical Node MMXU), and
    3. Use the protocol (MMS, ISO 9506) to just poll the current value with a MMS Read.
    We may have 10 bays with each providing the voltage phase A: then we could model this as follows:
    Bay1MMXU1.PhV.phsA
    Bay2MMXU1.PhV.phsA
    Bay3MMXU1.PhV.phsA
    ...
    Bay10MMXU1.PhV.phsA

    That's some basic benefit ... for a first “"brief introduction”.

    In addition (there are many other features to look at), e.g.:

    1. MMS allows to retrieve the Signal List (device model comprising all logical nodes ...) ...
    2. The system configuration language (SCL) allows to carry the "signal list" in form of an XML file ...
    3. SCL could carry the complete signal flow between any device in a system: who has which signal to offer, who needs which signal, how are signals carried between the many devices (real-time, non-realtime ...) ...
    4. SCL could carry the single line diagram (topology) of an electrical system ...
    5. SCL could carry how the information is related to the single line diagram ...
    6. …

    So, does IEC 61850 add to the complexity of power systems? No that much! See also:

    http://blog.iec61850.com/2014/10/does-iec-61850-add-complexity-for.html

    Be aware: There is more than IEC 61850 that has to be learned, understood and managed!

    Wednesday, November 5, 2014

    IEC 61850 Devices installed worldwide by Siemens: 300.000

    The amount of IEDs installed in China (see post of yesterday) is amazing: some 10.000 by each of the major vendors … in some 10.000 substations (by 2013).

    Siemens reported that they have installed 300.000 already:

    Siemens reported in 2010:
    As the world’s leading supplier of IEC61850 installations with over 1,000 reference sites,

    Siemens was proud to deliver the first IEC61850 installation for a transmission utility in Australia
    http://www.siemens.com.au/files/Energy/Distribution/ea_cs_electranet.pdf

    and in 2012: Siemens has the largest installed base worldwide:
    more than 200,000 Siemens devices with IEC 61850 are in operation around the globe.

    http://www.energy.siemens.com/MX/pool/hq/energy-topics/standards/iec-61850/IEC61850_e.pdf

    and in 2014: More than 300,000 devices with IEC 61850 are in operation around the globe
    http://w3.siemens.com/smartgrid/global/en/products-systems-solutions/smart-communication/pages/iec-61850.aspx

    These figures speak for themselves.

    Tuesday, November 4, 2014

    IEC 61850 in China: More than 10,000 Substations with IEC 61850 Devices in Operation

    One of the many responses to my newsletter dated 04 November 2014 informed me about the BIG SUCCESS of IEC 61850 in China.

    In a 2 page fact sheet dated October 2014 the authors report that by now more than 10,000 Substations in China (35KV to 1000kV) are equipped with IEC 61850 compliant devices. The top four vendors have each more than 10,000 IEC 61850 compliant devices in operation.

    I guess there have been more than 100.000 IEC 61850 compliant devices installed in the first 10 years after first substations equipped with IEC 61850.

    More to come.

    Click HERE for the 2 page fact sheet.