The first part of Edition 2 of IEC 61850 has been published as International Standard:
IEC 61850-6 Edition 2 (2009-12)
Communication networks and systems for power utility automation –
Part 6: Configuration description language for communication in electrical substations related to IEDs
Click HERE for the Preview of the standard IEC 61850-6 Edition 2.
The second edition provides several crucial extensions. One extension is the way how to specify the source of a signal needed by an IED in more detail. The following slide from the NettedAutomation training shows that in the SCL file for IED B the source can be specified:
The list of extended details for the specification of the signal source is shown in the next slide:
This allows to have a complete specification of the signal and how it is communicated. The specification uses a reference from the destination IED back to the source IED. The <Inputs>...</Inputs> represent a crucial part of the "wiring plan" of a substation automation system or any other automation system.