Friday, February 4, 2011

IEC 61850-8-1 Editon2 available for FDIS Ballot

The next parts out for FDIS (Final Draft International Standard) ballot are:

IEC 61850-8-1 Ed.2:
Communication networks and systems for power utility automation -
Part 8-1: Specific Communication Service Mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3

Ballot closes: 2011-04-08

IEC 61850-4 Ed.2:
Communication networks and systems for power utility automation -
Part 4: System and project management

Ballot closes: 2011-03-18

The most crucial changes in IEC 61850-8-1 Edition 2 compared to the Edition 1 are:

  • support of Gigabit Ethernet
  • link layer redundancy
  • extension of the length of the object reference: ObjectReference maps to a variable length MMS visible string with a maximum length of 129 octets.
  • extension of the reason for inclusion type for comprehensive logging
  • mapping of the tracking services
  • a second mapping of the objectReference when used in the tracking services, or as linking
  • extension of the AdditionalCause enumeration
  • simulation of GOOSE telegram
  • fixed-length encoded GOOSE message
  • removal of the SCL Control Block
  • mappings of ACSI service error codes and ISO 9506 error codes have changed. One change that should be noted is the change in usage of object-undefined. The object-undefined code has been replaced by object-non-existent in many responses.

No comments: