Friday, February 28, 2014

What are the Benefits of IEC 61850?

The question “What are the benefits of IEC 61850” has different flavors and multiple answers – it depends on what are you looking for. If you are looking just at the communication protocol, there are answers like:

  1. The client/server protocol (MMS) is a unified solution standardized some 25 years ago. It is a stable standard – unlikely to change in the future and accepted all over for many years.
  2. The GOOSE messaging is very unique and provides real-time information exchange in the msec range – accepted all over
  3. The Sampled Values messaging provides a unique solution for exchanging samples of currents, voltages, vibration measurements accepted all over.

If you are looking at the information models, there are really many crucial models defined and in use. No other standard (I am aware of) has such a rich set of information models that expose process information in a standardized way – all over accepted.

There is – of course – the crucial issue on the configuration language. In this post we will discuss the benefit of a unified model that allows to hide the different vendor-specific signal lists for Modbus communication in two different power quality meters. In the end, the unification of specific information profiles (or subsets) for, e.g., the electrical measurements makes IEC 61850 different compared to any other solution I know.

The power quality monitors used are: Janitza UMG 604 and Acuvim II. Both meters provide many measurements of the electrical system. The signals can be communicated by Modbus. Usually each vendor has a different approach to define the lists of signals – and especially the indexes used for the vary same signal is quite different and have to be mapped manually to any application – again and again. There is no way to agree on a single unified Modbus signal list that can be applied all over. The next figure shows the two devices, their signal “phase voltage” with different identifiers and indexes.

image

The unification of the information model is implemented in a simple gateway (com.tom BASIC 5.1). The gateway is based on a WEB-PLC that maps the incoming Modbus signals to IEC 61850 models. The IEC 61850 model uses the same logical node class and type. The type MMXU_0 is the subset of the MMXU class used in this application (of four data objects – as can be seen in the icd file). The instance MMXU1 can easily be “copied” to build a second instance: for the Acuvim II meter. Both instances use a unique MMXU logical node type (contained in the icd file). The model can be used to configure the IEC 61850 server device and an IEC 61850 client (in this case the IEDScout) as shown in the next figure.

image

The gateway solution is reasonable in case just a limited number of applications need the information communicated by IEC 61850.  The next step could be to integrate the “gateway” into the meter housing, as shown in the next figure:

image

The “heart” of the gateway (we use) is the Beck IPC@CHIP controller that could be applied as a subsystem in the meter. It manages the complete IEC 61850, IEC 61400-25, IEC 60870-5-104 or DNP3 communication.

The IEC 61850 models are the same as before in the case of using a separate gateway box. From a client point of view there is only one difference: there are two IP addresses and two IED names to take into account.

The configuration of the client could benefit from the unified information model contained in a standardized machine readable format (.icd). When you google for power meters with a Modbus interface (or any other fieldbus-like) interface you will get as many different signal list as solutions. In our case we can easily unify the information that comes from many different meters.

By the way, the unified model can be fed not only by a Modbus communication interface. Any other signal list communicated by the myriad of solutions could easily be unified! It does not matter how many different protocols you have to take into account – the very same IEC 61850 profile could serve them all. Define it once and use it for ever and all over.

The WEB-PLC based solution explained here is available – I have tested the concept with several devices: meters, monitoring devices, control devices. This approach could be applied right away – and you pay while you go. To get started with a extra box is in the range of some hundred Euro plus some time to understand the approach and learn how to get started with the product. The IPC@CHIP including IEC 61850 client and server (GOOSE and SMV), IEC 60870-5-104 server, and Modbus client costs less than 100 Euro – too cheap to ignore.

Let people define new protocols and … IEC 61850 can unify them all! The next days I will post a report on a hierarchical system with a Janitza UMG 604 and fan heater as the process, a com.tom device to monitor and control the process (with an IEC 61850 server), an a com.tom on top that could be used as a (proxy) gateway to the underlying com.tom (providing an IEC 61850 client, IEC 60870-5-104 server and an IEC 61850 server). The gateway interoperates in a plug&play manner with the underlying IEC 61850 IEDs.

I don’t fear the following situation:

image

nor this …

image

It is a change for IEC 61850 to unify the proliferation!

More to come shortly – stay tuned to this blog.

I had to wait almost 30 years to have a real simple and easy to use “MAP” solution running on my desk:

image

The MAP/TOP Demonstration in 1986 was too early! Definitely!

Monday, February 3, 2014

Beck IPC offers a second Free of Charge Workshop on March 12, 2014 in German and first in English

The first Application and Gateway Workshop of Beck IPC on IEC 60870-5-104, DNP3, IEC 61850, IEC 61400-25, … was conducted last Thursday (30 January 2014). The attendees appreciated the new approach of getting started with these solutions.

The second Workshop in German is scheduled for:

Datum: 12. März 2014
Ort: Wetzlar, etwa 70 km nördlich von Frankfurt
Zeit: 10:00 Uhr - 17:00 Uhr
Programm (Deutsch).

the first in English for:

Date: 13. March 2014
Location: Wetzlar (Germany), some 70 km north of Frankfurt
Time: 10:00 h - 17:00 h
Program (English).

Click HERE for more details and registration information for both events.

Check the posts below for some details on the solution.

Thursday, November 21, 2013

Reduced the Complexity of IEC 61850 to a Beautiful Simplicity

One of the crucial challenges using IEC 61850 is the complexity of IEC 61850 – maybe you have made this experience. There is a beautiful way to simplify. Interested to learn about this way? Read this post.

  • IEC 61850 and IEC 60870-5-104 (DNP3) are well known and used standards for many application domains all over.
  • IEC 60870-5-104 and DNP3 are the preferred solutions for Tele-Control and Tele-Monitoring. They provide simple exchange of status, measurements, counters, and control commands.
  • These protocols are implemented in most control centers and SCADA systems.
  • IEC 61850 is the preferred solution for information management for substation protection, monitoring, and automation.
  • The need for collecting more condition monitoring information from process equipment like transformers, switch gears, cable, … is preferably implemented by IEC 61850.
  • One crucial challenge is: How can the huge amount of IEC 61850 based information easily be carried by IEC 60870-5-104 (DNP3)?
  • A set of slides shows the beauty of a very simple and powerful gateway.

Want to see a live demo? Visit us at the SPS/IPC/Drives Fair in Nuremberg (Germany) on November 28-29, 2013, hall 9 / booth 341.

image

Click HERE for a free ticket. I look forward to meeting you there.
Click HERE for the complete slide set on the Beautiful Simplicity [68 pages, pdf, 3.9 MB].

image

The solution is based on the Beck IPC@CHIP solution:

image

The core component is a WEB-PLC that is used to graphically program your Gateway based on Input and Output signals:

image

(almost) all you need to do is to connect graphically Inputs and Outputs with each other or other logic (AND, OR, …):

image

Use the WEB-PLC for binary inputs and outputs or for reporting of measured values:

image

com.tom Energy Flyer [English]
com.tom Energy Flyer [Deutsch]

Any question? Contact us.

Tuesday, October 11, 2011

Plug and Play for IEC 61850 – Supported by Siemens

Siemens pushes for a crucial extension of IEC 61850: to allow Plug and Play features for IEDs according to a future IEC 61850:

IEC 61850’s primary focus (in the late 90’s) was on Substation Automation – this is still the crucial application domain today and for a long time. The application of IEC 61850 in various power generation and distribution application domains is likely to require further features – not yet defined. Several projects (E-Energy in Germany, SGIP’ Priority Action Plan (PAP), and other) have investigated in finding gaps in the standard definitions. One result is the definition of a Plug&Play extension developed by Siemens. Siemens has registered their ideas at the ip.com website. What does that mean? “Defensive publishing is a low cost way to prevent competitors from obtaining patents and protect your freedom to practice.”

Click HERE for a description what “Defensive Publishing” means.

Excerpt:

“The Plug and Play reference architecture based on well-known protocols like UPnP (Universal Plug and Play) and DPWS (Devices Profiles for Web Services) is used. Several exchanges and additions, e.g. with respect to discovery mechanisms, are proposed enabling IEC 61850 to support Plug & Play for "Smart Distribution".”

Click HERE for more information.

The work on Web Services that has been proposed by a New Work Item Proposal will become a crucial work for future applications.