http://www.energy.siemens.com/br/en/automation/power-transmission-distribution/protection/siprotec5/
Click on "Download Software & Documents" on right side of page.
The SIP 5.01 booklet is listed as "System Catalog V1.0"
IEC 61850, IEC 61400-25, IEC 61970 (CIM), IEC 60870-5, DNP3, IEC 62351 (Security), ...
http://www.energy.siemens.com/br/en/automation/power-transmission-distribution/protection/siprotec5/
Click on "Download Software & Documents" on right side of page.
The SIP 5.01 booklet is listed as "System Catalog V1.0"
Dr. Kai Strübbe, Head of Embedded Systems, TÜV SÜD AG, presented some crucial aspects of the Integration of renewable power into the Smart Grids at the Hanover Fair 2012:
The Integration of Wind Energy and Photovoltaic into a Smart Grid
Hannover Messe, 24 April 2012
According to the figures shown in the presentation there are more than 1,000,000 low voltage substations in Germany – most of them are not yet controllable! It’s a huge market.
He said that “IEC 61850 Will Be the Esparanto of the Smart Grid” – Right. IEC 61850 (IEC 61400-25) is a language that is already spoken in the medium and high voltage networks – the huge low voltage domain is next!
There is a huge interest in learning this language and easy to use IEC 61850 hardware and software shown during the fair in Hanover. The crucial questions were on how to implement the standards in a short time to market. SystemCorp and TQ had the right answer.
Download the presentation from Dr Stübbe [pdf, en, 1 MB]
By the way, there are still seats available for the next 3 day public IEC 61850 training in Frankfurt (Germany) from 09–11 May 2012.
If you are interested in the training and FREE IEC 61850 development kit DK61 contact us please.
Reinhard Bütikofer (Member of the EU Parliament) and Ludwig Karg (E-Energy) visited the TQ/SystemCorp booth C45 in Hall 13 on Wednesday (2012-04-25). They discussed the future of Smart Grids (under the headline of IEC 61850 and IEC 61850 embedded controllers from TQ):
Detlef Raddatz and Pritam Munot (both from SystemCorp, Perth Western Australia) have explained the benefits of IEC 61850 stack and API integrated on TQ embedded controllers (ARM 9 and ARM 11) – these products help to “Get Smart Quick”:
There is an overwhelming interest in IEC 61850 we are facing at the Hanover Fair 2012. The 47 page brochure from NettedAutomation on IEC 61850 and IEC 61400-25 distributed run already out at the third day!
The brochure is now available for download:
Download the 47 page brochure on IEC 68150 distributed at the Hanover Fair 2012 [pdf, 5.8 MB].
The following embedded controller are on display at the Hanover Fair; the interest in getting a package of a hardware piece with an integrated IEC 61850 API for servers and clients is huge:
TQ, SystemCorp and NettedAutomation present IEC 61850 on embedded ARM platforms at the Hanover Fair, from Monday to Friday (23.-27. April 2012) - (Hall 13 Stand C45):
The interest in IEC 61850/IEC 61400-25 on powerful embedded controllers is huge! Visitors from all over visited the booth for information or asked for offerings for small and large quantities during the first two days.
Vattenfall Europe New Energy GmbH and Vattenfall Europe Wärme AG seem to be ahead of many other utilities in implementing “virtual Power Plants”. They have set a standard on how to use renewable energy in a virtual power plant. The information exchange is realized with two IEC TC 57 standards: IEC 60870-5-104 (Fernwirktechnik) and IEC 61850-7-420 (DER).
Vattenfall is one of the leaders of the implementation of virtual power plants. The concept is called: VHP READY – Virtual Heat & Power Ready.
Their objective is by end of 2012 to provide their services to 150.000 housing units (with some 500 CHP or heat pumps) communicating with a Vattenfall control center. By 2013 they expect some 1,000 CHP or heat pumps providing heat and electric power to some 200.000 housing with an electric capacity of 200 MW.
The requirements document lists a total number of signals of 40:
Requirements document referring to IEC 60870-5-104 and IEC 61850 can be downloaded [German, pdf, 23 pages, 360 KB]
VHP READY – Virtual Heat & Power Ready
Vattenfall virtuelles Kraftwerk
Several other projects are under way in Germany to implement a similar approach. In one project there is already a plan to define (and possibly standardize) a specific profile (subset) of IEC 61850-7-420. Such a profile would represent the above some 40 signals – a very simple set of models that could easily be implemented in an IEC 61850 IED like the Beck IPC IEC 61850 com.tom:
More information on Beck IPC IEC 61850 com.tom.
Basic component for IEC 61850: the IPC@CIP
Download the discussion about benefits using Beck’s ready-to-go solutions with IEC 61850 [pdf, 2.3 MB, 18 pages]
IEC 61850 software, hardware and peopleware are crucial topics at the Hanover Fair 2012. SystemCorp, TQ and NettedAutomation provide all three:
IEC 61850 - Get there first with SystemCorp, TQ and NettedAutomation as competent partners!
IEC 61850 - Mit SystemCorp, TQ und NettedAutomation als kompetente Partner zuerst am Ziel!
The CDV of IEC 61850-10 “Communication networks and systems for power utility automation - Part 10: Conformance testing” has been approved by the 25 P-members of IEC TC 57 end of March 2012.
The next step will be the FDIS publication for final ballot.