IEC TC 57 just published the IEC 61850-4 Amendment 1 (57/1922/CDV)
– Communication networks and systems for power utility automation
– Part 4: System and project management
The main extensions of the edition 2 are:
The CDV (committee draft for vote) is accessible for PUBLIC comments by every interested person.
Note that the amendment has already been blended into the edition 2 document for easier reading: 57/1923/INF
These extensions answer a couple of questions that come up during every seminar and in many discussions. They are extending the explanations of SCL (part 6).
The document is worth to study.
– Communication networks and systems for power utility automation
– Part 4: System and project management
The main extensions of the edition 2 are:
- New sub-chapter 5.3.6 describes the engineering tool workflow and its chronology (which SCL files are exchanged in between configuration tools) through 3 use cases: the classical use case, the change of system tool and the interaction between 2 projects.
- New sub-chapter 6.4 talks about backward compatibility and deals with replacement or extension whatever the component is provided by the same or different manufacturer. To do so, it scrutinizes through 4 use cases, what kind of impacts could be acceptable for IED or tools.
The CDV (committee draft for vote) is accessible for PUBLIC comments by every interested person.
Note that the amendment has already been blended into the edition 2 document for easier reading: 57/1923/INF
These extensions answer a couple of questions that come up during every seminar and in many discussions. They are extending the explanations of SCL (part 6).
The document is worth to study.
No comments:
Post a Comment