Sampled Values and IEC 61850-9-2 LE: What is it?

The other day I received the following email:

Dear Mr. Karlheinz Schwarz,
I am sorry to disturb you. My name is XXX and I am a researcher from YYY. I would like to ask some questions to you regarding the standard IEC 61850-9-2LE.

1) May I know the status of IEC 61850-9-2LE? Is the standard will be obsolete or remain as it this?

2) Can I get some explanations from you about the differences between IEC 61850-9-2, IEC 61850-9-2LE and IEC 61869-9?

I really appreciate your kindness and time to answer my questions above.
Thank you & best regards,
-------------------------------
I have a very good friend that I asked to answer for me. Her is his answer:
Dear Karlheinz, 
Sure I can do my best for that.
Thanks for this opportunity.
Dear XXX, please see my attempt to answer.
Your questions are our everyday’s questions, and my answers need to be taken with “common sense”, reasonability and not as law, where somebody is right and somebody is wrong.
This is the best I can say.
The IEC 61850-9-2 Light Edition (LE)  is NOT a standard.  It is an UCA profile; a sort of gentlemen agreement (followed by everybody so far), where in principle the dataset carried by the SV Message (Sampled Values message) is fixed to 4 voltages and 4 currents.
The sampling frequency is 80 samples per period (4000 Hz for 50 Hz systems and 4800 Hz for 60 Hz systems).
The length of the SV message is fixed (in terms of bytes)
The quality string has one “extra bit” (the 14th bit, for derived or measured of the analog quantity) compared with a “normal quality string” of IEC 61850 and also IEC 61869 series, of 13 bits.
The time synchronization is 1-PPS
There is formally no support for PTP time synch (typical of “Edition 2” of IEC 61850 standard. LE is “edition 1”)
There is formally no support for “SIMULATION” mechanism (typical od “Edition 2 “ of IEC 61850 standard; LE is “edition 1”)
And many others.
TO MY EXPERIENCE:
It is commonly understood (and you have to make sure it is commonly understood also by the people working in your projects: suppliers, consultants, utility engineers etc) that:
- 9-2 LE supports Simulation mechanisms
- 9-2 LE supports PTP as time synch (be careful that PTP is actually IEC 61850-9-3: 2016 )
Even if formally this is not strictly in line with the UCA specification for “LE”.
So, IEC 61850-9-2LE (written by UCA working group) is a profile of IEC 61850-9-2 (written by the IEC committee TC 57)
And today it is the only “standard” that is implemented and in service for process bus applications.

IEC 61869-9 (and also -6 and also soon the -13) are parts of the IEC 61869 series, written by the IEC committee TC 38 (Instrument Transformer). 
So they have to do with the Merging Units, they are also profiles somehow, and also many other requirements, that you need to fulfill if you want to have a Merging Unit according to IEC standards.
To my opinion, no matter what IEC 61850 says in general, if you do a Merging Unit and follow IEC, you should follow IEC 61869 series.
In principle, the IEC 6185069-9 standards are often associated to:
  • “Dynamic” dataset. This means that not only 4 U and 4 I will be transmitted. I can transmit just  one voltage, or 25 currents, or 6 voltages and 3 currents.. This is done from SCL.
  • Sampling frequency of 4800 Hz, no matter the power system frequency (50 Hz or 60 Hz).
  • PTP time synchronization (for MU)
  • 2 samples per SV message (so called ASDU). “LE” has only one sample per message (one ASDU per message)
But it is of course much more than that.
What about protection relays/protection functions?
TC 95 is responsible for protection functions in IEC.
In principle it  is TC 95 / MT 4 (Maintenance Team 4) that takes care of functional standards for protection functions (IEC 60255-121:2014 for distance protection for example). Other maintenance teams take care of protection related standards like EMC etc.
Recently TC 95 has started a new working group (WG 2) that considers IEC 61850 for protection applications. A Technical Report is on its way and parts of that technical report will be implemented in the so called IEC 60255-1xx series, for protection relays.
But this is not ready yet and all of this needs to be considered with extreme care and communication among all the involved parts in a project.
I work as well as consultant for IEC 61850 applications in relay protection. Mainly for TSOs, since many years. Please have a look at this paper, written by many of us active in TC 95 / WG2. I think it will help you to better understand.
If you are interested in what TC 95 / WG2 does, you are more than welcome to contact me and I’ll help you in joining “our” activities.
For your understanding, there is a high dialog between TC 95, TC 38 and TC 17 (circuit breakers) for making the use of IEC 61850 more interoperable not only at “data level” but also at “functional level”, at least for protection applications.
For metering or power quality applications, for example, I don’t know what to say.
I hope this helps you.
Karlheinz, your extra comments are always welcome.
My best regards
Andrea Bonetti
Just passed

 Fachtagung Schutz- und Leittechnik 2020 , Berlin, 18-19 February 2020

Mr. Andrea Bonetti MSEE
Senior Application Specialist Relay Protection and IEC 61850
Active member of IEC TC 95 / MT 4 ”Measuring relays and protection equipment” since 2006.
Megger Sweden AB
andrea.bonetti@megger.com
Rinkebyvägen 19, SE-182 36 Danderyd (Stockholm)
Sweden

Tuesday, May 12, 2020

New GOOSE and Sampled Values Performance Test Platform

GridClone developed a new GOOSE and Sampled Values Performance Test Platform:

SIMFLEX IEC 61850 PT Platform

It is a solution for testing GOOSE and Sample Values time performance, functional behavior and conformance to the standard.

Applications:
  • Inspect GOOSE/SV behavior on microsecond level
  • Simulate multiple GOOSE and SV Streams
  • Execute (pre)conformance, detail and functional testing
Benefits:
  • One solution for GOOSE/SV and MMS testing
  • Demystify process bus complex behavior
  • Ready to integrate fully automated platform
Values:
  • Building trust in Digital Substation by testing it
  • Resolve GOOSE/SV issues in system design phase
  • Maximize level of details and minimize testing time
Click HERE for more information.

Friday, December 29, 2017

New Merging Unit Development Kit

A new Merging Unit Development Kit based on the NovTech IoT Smart Grid Platform with Intel Cyclone V SoC Core is available for your next project.
Utility companies are adapting their infrastructures to support bidirectional energy flow to handle the emergence of DER (Distributed Energy Resources) via microgrids, photovoltaic panels, and local energy storage. As distributed energy generation increases, new intelligence of sensors, measurement and protection equipment will be required to process data at the edge. Also with the increase in variable DER, it is more challenging for substations to deliver sinusoidal and predictable steady-state voltage and current. Utility companies rely on substation metering of secondary voltage (VT) and current transformer (CT) circuits to detect performance issues and to provide vital information in real time to distributed digital protection nodes.

To satisfy this need, SystemCORP and Intel developed an IEC 61850-9-2LE compliant merging unit solution in form of a demonstrator/development platform.

This development kit consists of 6 parts:

  1. NovTech IoT Octopus Smart Grid IoT Platform
  2. SystemCORP VT/CT Interface board
  3. SystemCORP IEC 61850-9-2LE Sample Value software stack (PIS-11) on ARM Cortex A9 core 1
  4. SystemCORP IEC standard 61850 server/client software stack (PIS-10) on ARM Cortex A9 core 2 (optional)
  5. Flexibilis embedded FPGA analogue front-end IP core
  6. Flexibilis Ethernet PRP/HSR FPGA IP core (optional) 

Click HERE for more information.

Friday, January 16, 2015

IEC 61850-90-12 “Wide Area Network Engineering Guidelines”

The first draft Technical Report (TR) for the future IEC TR 61850-90-12 has been published the other day (57/1536/DTR):

IEC 61850-90-12 TR: Communication networks and systems for power utility automation - Part 90-12: Wide area network engineering guidelines

Voting on this 202 page draft closes 2015-03-13

Wide area networks comprise in this context optical, radio, power line carrier, copper physical layers, with many topologies like rings, trees, and meshed networks, using different protocols (SDH, IP, MPLS, ...), data traffic (packet switching, TDM), and for a variety of applications (protection, SCADA, voice, video, …) for applications: between substations, between substations and control centers, and between control centers. One crucial aspect relates to protection data transmission via GOOSE, and the multicast data exchange of large amounts of sampled values (SV).

The list of normative references is quite long: some 150 documents are listed. Some examples are:

  • IEEE 802.1ag, IEEE standards for local and metropolitan area network; Virtual Bridged Local Area Networks Amendment 5: Connectivity Fault Management)
  • IEEE 802.1ah, IEEE standards for local and metropolitan area network; Provider Backbone Bridges
  • IEEE 802.1Qay, Provider Backbone Bridge Traffic Engineering
  • IEEE 802.1x, Port-based Network Access Control
  • ITU-T G.0774-04: Synchronous Digital Hierarchy (SDH) - Management of the sub network connection protection for the network element view.
  • RFC 3261, SIP: Session Initiation Protocol
  • RFC 3376, Internet Group Management Protocol, Version 3

The list of abbreviations comprises some 300 terms from AAA (Authentication, Authorization and Accounting (security)) to ZBFW (Zone-Based Firewall).

The utilities all over have to get prepared for the huge amount of information to be shared on many different levels from switch gears all the way up to control centers … for many applications. You have to expect that the content of the IEC 61850-90-12 is a MUST reading for utility experts.

You could find a report that shows the importance of this part to a large utility:

Click HERE for a 200 page report: Faramarz Maghsoodlou and Jean Raymond, “Cisco and Hydro-Québec Use cases proposal for IEC 61850-90-12, August 2014.”