Sunday, November 21, 2010

Cost for IEC 61850 versus DNP3 or IEC 60870-5-104

Very often people ask me: "What is the cost for implementing of the protocols IEC 61850, DNP3 and IEC 60870-5-104? Isn't DNP3 cheaper?". First of all, IEC 61850 is much more than another protocol! IEC 61850 comprises communication services and protocols for SCADA and REAL-TIME applications. It offers metadata in the devices and self-description services, many information models and a very crucial System Configuration Language.

image

If we compare the SCADA services and protocols, we can expect that the efforts to implement one or the other communication protocol is more or less the same - when we implement a subset in IEC 61850 that is functionally equivalent to DNP3 and 104.

The other features of IEC 61850 (Real-time services and protocols, self-description services, many information models, and System Configuration Language) are NOT defined in DNP3 and 104. So, what does it mean to state that it is easier and cheaper to implement DNP3 and 104 than IEC 61850? If we want compare them, we should state exactly, what we compare!

If we compare just the underlying services and protocols: all three solutions require TCP/IP, ... -> no real difference!

Lets look at the messaging: All three require to encode and decode a variety of messages and sequences ... may be slightly different.

The basic data types like Double-Point, Status, Time-Stamp, Quality, ... are more or less the same.

What else do we want to compare? The other features are defined in IEC 61850 only. Comparison means: IEC 61850 HAS them - the others don't HAVE them. That's it.

SCL - For Substations or Systems?

The official title of IEC 61850-6:2009 Edition 2 (SCL) is:

Communication networks and systems for power utility automation –
Part 6: Configuration description language for communication in electrical
substations related to IEDs

What does SCL stand for: "Substation Configuration Language" or "System Configuration Language"?

The official Abbreviation in the Edition 2 of part 6 is as follows:

SCL = "System Configuration description Language"

Except the substation section all other sections and definitions can be used for any application domain: hydro power, DER, wind power, power quality, SCADA, ...

CISCO to deliver IP Communication Infrastructure including Substations

EnergyAustralia selected Cisco's Connected Grid solution to build the core of its smart grid infrastructure with greater security, reliability, and operational efficiency, while complying with regulatory mandates and industry standards such as IEC 61850 and supporting new energy supply sources.

Click HERE for the news.

IEC 61850 Timestamp to overflow in 2038?

In 61850-7-2 Edition 1 the definition of TimeStamp.SecondSinceEpoch is an INT32, which represents seconds since 1/1/1970. This will overflow in 2038, at which time equipment now being developed will be in use.

The Timestamp type in IEC 61850-7-2 Edition 2 is INT32U. The timestamp will not overflow until 2106.

Saturday, November 13, 2010

IEC 61850 also for industrial applications?!

Karlheinz Schwarz (SCC) presented IEC 61850 to some 50 experts from the industrial automation domain at the KommA Colloquium in Lemgo (Germany) on Thursday (2010-11-11): 1. Jahreskolloquium „Kommunikation in der Automation (KommA 2010)“ Centrum Industrial IT (CIIT)

The title and paper are in German: "IEC 61850 nur für Schaltanlagen und Smart Grids – oder Kernmodell für die Automatisierung?"

Click HERE for the slides presented (almost all of the 32 slides are in English).

The presentation showed that IEC 61850 has been developed by experts from the electric power domain - especially substation engineers (protection, control, asset management, ...). The standard defines by the end of 2010 many information models that are applicable in any application domain. Example: the Logical Node STMP (Supervision of Temperature, according to IEC 61850-7-4 Ed2). The following excerpts of the presentation show the LN STMP and the implemented subset - check out the Evaluation/Starter Kit and the Beck IPC IEC61850@Chip that use this and other LNs.

image

The information model offers a build-in supervision functionality. The STMP1.Alm (Alarm) is spontaneously sent to a dedicated client (HMI, SCADA, Gateway, ...) as soon as the TMP value reaches the TmpAlmSpt (Alarm Setpoint Value - configured, programmed or set by a communication service):

image

The information model and its binding to the real application is described in a SCL file (System Configuration Language, IEC 61850-6). The SCL file is uploaded per FTP to the Beck Chip. After resetting the Chip, the application reads the SCL file, builds the model and binds it to the application.

image

The API between the IEC 61850 Stack (provided by SystemCorp, Perth, Western Australia) and the application is quite simple:

image

The underlying layers are presented and discussed during the Hands-on Training offered by NettedAutomation - Training "Made in Germany".

Tuesday, November 9, 2010

IEC 61850-4 CDV for Edition 2 has been accepted

A further part of IEC 61850 has been approved as FDIS Edition 2:

IEC 61850-4 Ed.2.0: Communication networks and systems for power utility automation - Part 4: System and project management

The CDV ballot closed last Friday (2010-11-05).

All votes were positive.

IEC 61850-7-3 Edition 2 approved

Another part of IEC 61850 has been approved as Edition 2:

IEC 61850-7-3 Ed.2: Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

The FDIS ballot closed last Friday (2010-11-05).

All votes were positive.

Free Cyber Security Training

Several Cyber-Security Training courses are now available on the TEEX Domestic Preparedness Campus. This DHS/FEMA Certified Cyber-Security Training is designed to ensure that the privacy, reliability, and integrity of the information systems that power our global economy remain intact and secure.

The 10 courses are offered through three discipline-specific tracks targeting everyday non-technical computer users, technical IT professionals, and business managers and professionals.

These courses are offered at no cost and students earn a DHS/FEMA Certificate of completion along with Continuing Education Units (CEU) at the completion of each course.

Click HERE for more information and how to use the material.

Tuesday, November 2, 2010

One day "Getting Started Event" on IEC 61850 in Orlando and San Diego end of January 2011

NettedAutomation GmbH /Karlsruhe, Germany) is offering a one day "Getting Started Event" on IEC 61850 and related standards. The program comprises the basics of Edition 1 and 2, an overview on global acceptance and use of the standard, and presentation one of the most efficient and easy to use stack software developed by SystemCorp in Perth (Western Australia).

Dates and Locations:

  • Friday, 28. January 2011 in Orlando (Florida)
  • Monday, 31. January 2011 in San Diego (California) - just prior to the DistribuTECH 2011

Attendance Fee:

  • US$ 295 (including course material, evaluation software, food and beverages).

Students will learn what the standard is all about and how to use the free of charge fully functional evaluation stack software (DLL) for implementing IEC 61850 client/server and publisher/subscriber under Windows. Various application examples written in C, C++ and C# (executable and source code) will be provided to the attendees. This is the FASTEST, EASIEST, and CHEAPEST way to get your devices' data modeled and right away communicated with IEC 61850.

This event is recommended for every person that is interested in IEC 61850 and IEC 61400-25 ... one way or the other. There is no pre-knowledge needed.

IEC 61850 is THE International Standard series for information modeling, information exchange and system configuration to support Smart(er) Automation. Smart(er) Automation comprises application domain like Power Generation, Power Transmission, Power Distribution, Factory Automation, Building Automation, and many other domains.

The new title of IEC 61850 (Communication networks and systems for power utility automation) is definitely wider than the old (Communication networks and systems in substations). IEC does not allow to use the right title that would really describe its application domain: Communication networks and systems for automation.

All basic concepts of IEC 61850 (and IEC 61400-25) are applicable in any automation system:

  • native Ethernet for real-time information exchange (GOOSE) and client/server communication,
  • TCP/IP including transport layer security for client/server,
  • application messaging according to MMS (Manufacturing Message Specification, ISO 9506),
  • XML for describing information objects and system configuration,
  • many common information objects and functions like "Temperature Supervision", "PID loop control", "device nameplate", etc

Tentative program:

09:30 – 09:45 Welcome, roll call of attendees, expectations
09:45 – 10:45 Introduction into information modeling, models, information exchange and protocols, configuration language SCL ... IEC 61850 and IEC 61400-25
10:45 – 11:00 Coffee break
11:00 - 11:15 The role of the standards in the U.S. NIST SGIP (Smart Grid Interoperability Panel)
11:15 – 12:00 Implementations and global market penetration of IEC 61850 and IEC 61400-25
12:00 - 13:00 Lunch break
13:00 – 14:30 Presentation of SystemCorp’s IEC 61850 Stack PIS-10, IEC 61850 DLL running under Windows, integration of the stack on an embedded controller, SCL tools, network analyzers, etc
14:30 – 14:45 Coffee break
14:45 - 16:00 How to model and interface your application data with the PIS-10 stack API? Sample source code in C, C++ and C# (.Net) will be presented and discussed. Application Source code will be provided on a CD ROM.
16:00 – 17:00 Question & Answer Session
17:00 End of the event

The event will be conducted by Mr. Karlheinz Schwarz. He has trained more than 2.200 people, from more than 50 countries and more than 400 companies since 2004 - all over. Recent training sessions: Frankfurt (DE), Sydney (AU), Montreal (CAN), Dallas (US), Gothenburg (SE), Manila (Phil), Stockholm (SE).

Tap the reach experience of Mr. Schwarz. After the event you or your programmer can continue to use the evaluation software for your real applications!

If you are interested to attend, please let us know. I look forward to seeing you in Orlando or San Diego. Visit SystemCorp and NettedAutomation at the DistribuTECH 2011 (San Diego).

Click HERE to contact us for more information on the "Getting Started Events" in Orlando and San Diego.

Thursday, October 28, 2010

System Control & Supervision - and Peopleware

The Washington Post reported on October 23, 2010, that the lack of training could cause very severe situations in the energy transmission and distribution systems. The recent event of the San Bruno gas pipeline burst (that killed several people) has "speed up adoption of a rule to ensure that workers doing similar jobs at companies across the country are well-trained ...".

"If somebody is not trained, it could be very dangerous. If they don't properly respond to an alarm situation, it can cause an explosion. It can
cause leaks. The damage could be very large."

"Although pipeline companies boast an impressive array of technology, he said, at many such firms, "there is a lack of recognition that people
have to operate that equipment
.""

My experience after training of more than 2.000 people form more than 500 companies and more than 50 countries with regard to advanced communication and information systems using IEC 61850 is this: There is a very huge lack of recognition that people have to design, engineer, commission, operate, diagnose, and maintain these comprehensive and complex systems in substations and many other applications. More often I see the following: Utilities purchase turnkey systems - without having their own technical people (from the field with many years experience in the power system) consulted or trained to work with the new technology. One year later when the warranty is finished, they have to take over the full responsibility for the whole system! Good luck!

Impact of IEC 61850 on System Engineering, Tools, Peopleware and the Role of the System Integrator: more on that issue in a [paper] and on [slides]

Click HERE for the full report in the Washington Post.

Monday, October 25, 2010

Beck IPC - Workshop IEC 61850 (IEC 61400-25) und Programmierung des Beck Chip für IEC61850-Anwendungen

Die Schulung findet am 10.-11. November 2010 in Pohlheim bei Gießen statt. Sie vermittelt die wichtigsten Schritte zur schnellen und kostengünstige Implementierung von IEC 61850 und IEC 61400-25 konformen Geräten und Systemen basierend auf dem Beck IPC@Chip.

Was ist der Beck Chip?

Click HIER für mehr Informationen zum Workshop.

Friday, October 22, 2010

IEC 61850-7-410 and IEC 61850-7-510 are out for comments

The CDV (Committee Draft for Vote) of IEC 61850-7-410 Ed.2:

Communication networks and systems for power utility automation -
Part 7-410: Hydroelectric power plants - Communication for monitoring and control

is out for official comments and voting until 3010-03-11. Contact your TC 57 National Committee for a copy for comments.

A companion document has also been published yesterday:

Draft IEC TR 61850-7-510:

Communication networks and systems for power utility automation - Part 7-510: Hydroelectric power plants - Modeling concepts and guidelines (developed by WG 18: Hydropower plants, communication for monitoring and control).

The publication of IEC 61850-7-410 introduces the general modeling concepts of IEC 61850 to hydroelectric power plants. This Technical Report is intended to provide explanations on how to use the Logical Nodes
defined in IEC 61850-7-410 as well as other documents in the IEC 61850 series to model complex control functions in power plants.

Contact your TC 57 National Committee for a copy for comments.

IEC 61850-6 SCL (System Configuration Language) in Operation

One of the most crucial aspects of IEC 61850 is defined in part 6 "Configuration description language for communication in electrical substations related to IEDs". The abbreviation is SCL; SCL stands for "System Configuration Language". One example of a system is a Substation. But it could be any automation system. IEC did not support the request to change "Substation" in the title to "System".

An increasing number of vendors is understanding the impact of SCL on the configuration of a single IED (Intelligent Electronic Device) but also of a whole system. In my training courses I usually say that SCL represents 51 per cent of the importance of the standard ;-)

Invensys uses a SCL tool to configure their SCADA system.

Click HERE to read a brief description what SCL does for their SCADA system.

Thursday, October 21, 2010

Siemens uses Trilliant for IEC 61850 based Smart Grids - ABB invests in Trilliant

Trilliant Incorporated and Siemens Energy, Inc., announced product interoperability for integrating distribution automation solutions for utility customers. Available immediately, Trilliant’s SecureMesh™ WAN, a Smart Grid communication solution for distribution networking, is interoperable with Siemens’ SIPROTEC® Compact line/feeder protection devices.

Trilliant’s SecureMesh WAN provides low latency communications required of distribution automation protocols including DNP3, IEC 61850, and Modbus. It supports low latency peer-to-peer generic object oriented substation event (GOOSE) messaging !!! GOOSE all over! This Fall is a good time for GOOSE ... ;-)

Trilliant raises $106 Million of Capital: Investor Growth Capital, VantagePoint, ABB, and GE invest in Trilliant

When winds of change blow, some build walls, others build windmills - or Invest in Interoperable IEC 61850 Communication Infrastructures. And you!?

Click HERE for the press release for the cooperation Trilliant/Siemens.
Click HERE for the press release on ABB's investment in Trilliant.

Saturday, October 16, 2010

Honeywell offers RTU with IEC 61850

Honeywell RTUs are IEC 61850 compliant. According to Honeywell this reduces time and engineering to complete a project, reduces wires, enhances security and simplifies system structures.

Click HERE to download a technical specification [pdf, 1.5 MB]

IEC 61400-25-6 has been Approved as International Standard

The 6th part of IEC 61400-25 has been approved as International Standard on October 15, 2010. The final draft (FDIS) has been approved by 100 per cent of the IEC TC 88 national committees. The Standard will be published in some weeks.

IEC 61400-25-6 Ed.1: Wind Turbines - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring

The new International Standard defines new information models.

Click HERE for the preview of the FDIS.

ISaGRAF Supports IEC 61499 and IEC 61850

ISaGRAF has released the version 6 of their Workbench.

The company's flagship product ISaGRAF is fully compliant with both IEC 61499 and IEC 61131 industrial standards and can be used to build a variety of automation products including embedded µcontrollers, PAC, PLC, DCS, RTU, CNC, Motion Controllers and Safety Systems. Supporting IEC 61850 ... ISaGRAF sustains a high level of standardization, integration and communication within modern automation systems, resulting in high-end, real-time open control systems with crash-proof reliability, powerful performance and flexibility.

Click HERE to visit the Newsletter at ISaGRAF.

Thursday, October 14, 2010

IEC 61850 in Australia - Some up-to-date Information

The Australiasien Power Technologies Magazine "Transmission & Distribution" published a couple for brief papers on IEC 61850 in the latest issue (05/2010). The following papers are contained:

  • What Is IEC 6185O?
  • Collaborative Engineering within Electrical Utilities
  • Relay Application with IEC 61850 GOOSE Messages
  • Scalable IEC 61850 Software Stack (Need Evaluation Software?)
  • IEC 61850-9-2LE Process Bus Interface (more information)
  • Digital Instrument Transformers with 9-2LE Interface

Please CLICK here to read the magazine.